Buddy robotics
| Customization: | Available |
|---|---|
| After-sales Service: | Technical Guidance |
| Warranty: | One-Year Warranty |
Our EDJ series diesel engine fire pump unit is strictly in accordance with the Chinese national standard GB 6245 "Fire Pump" and GB 27898.5-2011. This compliant product carries the 3CF mandatory certification, ensuring one-time project acceptance for petrochemical, logistics warehousing, and urban complexes.


Independent Power: Equipped with diesel power to ensure water supply during grid failures or fire-induced short circuits.
Fast Start-up: Reaches full load within ≤ 15 seconds, significantly faster than the national standard requirement of 30 seconds.


| Model | GPM (Q) | Bar (H) | Electric Pump | Diesel Pump | Jockey Pump |
|---|---|---|---|---|---|
| EDJ 50/6-5.5 | 50 | 6 | 5.5HP | 8.6HP | 1HP |
| EDJ 100/8-15 | 100 | 8 | 15HP | 27HP | 2HP |
| EDJ 200/10-50 | 200 | 10 | 50HP | 58HP | 4HP |
| EDJ 500/11-75 | 500 | 11 | 75HP | 75HP | 10HP |



Highly adaptable to extreme environments, working efficiently from -25°C to 55°C. Suitable for high-altitude mines (up to 2500m) and harsh industrial scenarios with IP55 protection.
We are a large-scale diversified mechanical equipment manufacturing enterprise integrating design, development, manufacturing, and service. Our technical team is committed to upgrading fluid industry products through scientific management and international quality system testing.


A: We are a manufacturer integrating industry and trade. You are welcome to visit our production facilities.
A: Yes, we support on-demand customization, including logo, color, and appearance size to meet your branding needs.
A: We support T/T, Western Union, PayPal, and cash. Specific terms can be negotiated during the order process.
A: We select the most appropriate mode (sea, air, or land) based on the goods' condition and your specific requirements.
A: Please send your specific demand details and product preferences; we will customize a solution and provide a detailed price.
A: Usually 15 days for quantities between 1-10 pieces. Larger orders are subject to negotiation.